Sep 3, 2010

Project '59 - Wind shield!

Finally got the wind shield in place!

New glass from www.veterania.se - top notch and fair price!
New rubber and molding from www.wolfsburgwest.com - simply the best!

Luck struck me last week when doing a quick search of one of the local scrap yards - In the far back was a 82 Volvo station wagon lurking - It had seen better days :-)! I carefully tore the inside cover off the tail gate and discovered a mint condition wiper motor (12V, SWF) - A direct swap with the existing/original 6V, SWF unit - Great stuff!





Aug 13, 2010

Where we live...

This is where it (supposedly :-)!) is happening. Plenty of space (3 large ports).
Work continues on the '59 project while preparing for the trip to SCC (www.sccevent.com) next week end!








Aug 5, 2010

Project '59 - Down on all four!




Mounted tires on back rims today and lowered it down on the ground for a quick "stance check" - Need to raise it an inch in the front to get the "perfect stance"...

Tires and rims (EMPI BRM repops):
  • Front - 5" rims, 145/15
  • Rear - 5"rims, 205/70/15

Jul 14, 2010

Project '59 - Interior progress

Spent the last couple of days working on the interior. The "Recipe":
  • Headliner: Original style, Mohair cloth, beige
  • Seat covers: Brick red with off white piping
  • Carpet: Oatmeal with board
  • Door panels: Brick red/off white











After media blasting and painting the gas tank it's back in place - looking good!
(gas tank clips from "Vintage Speed" - CNC Aluminum/polished - Nice touch!)

Jun 15, 2010

Project 59 - Front end in place!

Well, slow progress perhaps (?)...BUT, it's coming together piece by piece...Front end assembled and mounted in place...I will be running a 2" narrowed/adjustable "Puma" beam with lowered spindles...mounted to the axles/spindles are disc brakes...naturally the braking system is upgraded to dual circuit...

Disc drivers side


Dual circuit master cylinder with Volvo 240 (!) reservoar


Back down on the ground....just checking stance - Inspiring as always :-) !!!

May 24, 2010

Project 59 - Headliner done!!!!





I'll spare you all the "fun" aspects of headliner installation :-)...Instead, enjoy the finished headliner :-)...
This being a "major" sub project taking time it's now time to push on with EVERYTHING else.
Carpeting, door panels and seat upholstery is next - I.e interior duties!

May 6, 2010

Another 2 years


Check it out - a CLEAN record from today's visit with SBP (inspection)!...another 2 years until it's time again - Good stuff!